How to Conduct FMEA – The 7-Steps Approach

Detailed Analysis and Deployment 

 

System Analysis (Steps 1-3) 

  • Project Definition: Develop a project plan (5Ts: Target, Timing, Team, Tasks, Template). 

  • Structure Analysis: Visualize system, subsystem, and component relationships (structure tree, block diagram). 

  • Functional Analysis: Define functions, requirements, and parameter diagrams (P-Diagram). 

 

Failure Analysis & Risk Mitigation (Steps 4-6) 

  • Failure Chain Development: Identify potential failure effects, modes, and causes. 

  • Risk Assessment: Evaluate severity, occurrence, and detection for each failure chain to determine the Action Priority (AP). 

  • Optimization: Assign preventive and detective controls, implement actions, and assess their effectiveness. 

 

Risk Communication (Step 7) 

  • Documentation of Results: Record all analysis results, actions taken, and risk assessments (FMEA Documentation, Cover Sheet). 

  • Special Characteristics Identification: Prepare customer-specific reports and develop the Special Characteristics Matrix. 


Contact Us

  • Address: İstanbul Dünya Ticaret Merkezi Atatürk Cad. No:10 A3 Blok Çarşı Kat 1-482 Yeşilköy / İSTANBUL

  • Phone : 0532 653 50 96

Follow Us